


Holden Beach is a family vacation island, and most pools here have two jobs: be great for the owners, and earn their keep as a rental feature. The building conditions are classic barrier island: deep sand, a high water table, elevated homes on pilings and flood-zone rules on almost every lot. Canal lots add bulkheads and close groundwater. Oceanfront lots add salt, wind and CAMA rules.
That’s why the structure matters more here than almost anywhere. Every Smart Pools island shell is engineered against groundwater, uses more steel than the code minimum, and gets a concrete densifier after the shotcrete. We also plan the equipment route over the bridge and across the lot before we quote, so there are no surprises on the first day of digging.

A pool needs a building permit, an electrical permit and a barrier inspection. Island lots in flood zones, and oceanfront lots in the CAMA ocean hazard area, may need additional review. Rental homes also need barrier and safety features that meet North Carolina pool safety rules. We handle the full permit package and check flood zone, coverage and setbacks on the first visit.
Smart Pools custom concrete pools start at about $100,000. Most Holden Beach builds land between $130,000 and $200,000, with island lots on the higher side because of access, groundwater control and elevation. A heater, a spa and rental-grade safety features are the most common additions here. See the Brunswick County cost guide and yearly ownership costs.
Design and permitting usually take two to four weeks. If your lot needs a CAMA permit, which is common on the oceanfront, that step can take longer. Once excavation starts, most pools are ready to swim in 8 to 12 weeks. Rental owners should start design in fall to be ready for the summer season. Waiting until spring usually means missing it.
We also build in Ocean Isle Beach, Shallotte, Oak Island and Sunset Beach.
Yes. Canal lots need extra attention to groundwater and to the bulkhead, and we plan both before the design is final.
Smart Pools pools start at about $100,000. Most Holden Beach builds run $130,000 to $200,000.
A heated pool is one of the most-searched rental features, and it often lets owners book more weeks. See our honest look at rental pools and pool value.
Ideally in fall or early winter. That leaves time for two to four weeks of design and permitting (longer with a CAMA permit) and 8 to 12 weeks of construction before the season starts.
A properly engineered concrete pool is one of the sturdiest structures on a lot. Keep it full during a storm, and we place and protect the equipment with storms in mind.
Book a free design consultation at your property. Call (910) 664-7374 or request a consultation.
Schedule a Free Design Consultation Today