


Southport lots vary a lot from block to block. In and around the historic district, lots are small and mature trees, older foundations and narrow access are the norm, so the pool has to be designed around what’s already there. Waterfront lots facing the river and marsh bring flood-zone rules and groundwater close to the surface. Most of our pools in the Southport area are in neighboring St. James, where lots are larger and every pool goes through the community’s architectural review. We also build in the town of Southport itself, where the challenge is usually fitting a well-built pool onto a tighter lot.
Whatever the lot, the shell is engineered for sandy coastal soil and groundwater, with more steel and a thicker floor and walls than the code minimum. On a coastal lot, the structure underneath is what decides whether a pool still looks good in 20 years.
A pool in Southport needs a building permit, an electrical permit and a barrier inspection, through the City of Southport or Brunswick County depending on where the lot sits. Inside the historic district, work visible from the street may also go to the city’s historic preservation review, so fence style and equipment placement need extra thought. Waterfront lots may also need flood-zone review. We prepare the full permit package, including the surveyed site plan, structural drawings and electrical details, and we build HOA or historic review time into the schedule from day one.
Custom concrete pools from Smart Pools start at about $100,000. Compact pools on in-town lots usually run $100,000 to $130,000, and most mid-size builds land between $130,000 and $180,000. In Southport, site access is often the biggest variable: a narrow in-town lot can need smaller equipment and more time. See the full Brunswick County pool cost guide.
Design and permitting usually take two to four weeks. A CAMA permit on a waterfront lot, or HOA or historic review, can take longer. Once excavation starts, most pools are ready to swim in 8 to 12 weeks. Southport homeowners who want to swim by summer usually start design in fall or winter (best time to build).
We also build in St. James, Oak Island, Bolivia and Leland.
Often, yes. A custom concrete pool can be shaped to fit tight spaces, and a plunge pool or compact lap pool works on many in-town lots. Setbacks, coverage limits and historic review decide what’s possible, and we check all three before designing.
We do. That covers the building and electrical permits, the barrier inspection, and the drawings for any HOA or historic review.
Smart Pools custom concrete pools start at about $100,000. Most Southport builds land between $130,000 and $180,000.
Design and permitting usually take two to four weeks (longer if a CAMA permit is needed), then 8 to 12 weeks from excavation to first swim.
Yes. Every custom pool includes 2D and 3D designs overlaid on your site plan (3D pool design).
Book a free design consultation at your property. Call (910) 664-7374 or request a consultation.
Schedule a Free Design Consultation Today